The Annexure

News to 25 November 2026 ·

Desk›Construction› Sadbhav Engineering Ltd

Sadbhav Engineering Ltd

BSE 532710 · NSE SADBHAV · ISIN INE226H01026 · Group B · Active

Industrials › Construction › Construction › Civil Construction

₹8.46

+4.96%

BSE close, 28 August 2026

Market cap

₹145.15 cr

17.2 cr shares · Micro cap

Free float

₹108.06 cr

as published

P/E · P/B

35.2× · 0.15×

EPS ₹0.24 · BV ₹56.40

FY25-26 rev / PAT

167.84 / 13.38

₹ cr, as filed

Filings, window

11

3 selected · 27%

Regime

Reg 30

Sch. III Part A

Price 52-week, BSE

52-WK LOW ₹5.87 52-WK HIGH ₹15.41 ₹8.46 27% of range
Against 52-week high-45.1%
Against 52-week low+44.1%
Day change+4.96%
Size bandMicro cap
Index membershipNone

Valuation as published by BSE

Earnings per share₹0.24
Price / earnings35.25×
Price / book0.15×
Book value — derived, price ÷ P/B₹56.40
Return on equity0.42%
Operating margin63.71%
Net margin-47.85%

Consistency check

P/B ÷ P/E, which must equal ROE
0.43%
ROE as published
0.42%

Reported results ₹ crore, as filed

RevenueNet profit one scale across all three periods, ₹ crore

PeriodRevenue ₹cr Net profit ₹cr EPS ₹OPM NPM
Jun-26 · Q 20.34 -9.74 -0.57 63.71% -47.85%
Mar-26 · Q 58.83 29.44 1.72 256.73% 50.04%
FY25-26 167.84 13.38 0.78 147.70% 7.97%

Quarter on quarter

Revenue, quarter on quarter
-65.4%
Net profit, quarter on quarter
-133.1%
Operating margin, quarter on quarter
-19,302 bps

Disclosure profile 11 filings in the window

0 median 15.0 p75 · 22 sector max 44 11 37th percentile of 148 Construction filers
Shaded is the middle half of the sector, 9 to 22 filings. Measured against the 148 Construction companies that filed at all in this window — companies with no filings are excluded, so this is a percentile against filers rather than against the sector.
TagFilings
Selected
Auditor Resignation1
Board Outcome1
Results1
Selected sub-total3
Procedural
AGM / EGM3
Newspaper Publication2
Annual Report1
Board Meeting1
Trading Window1
Procedural sub-total8
Total11

Disclosure regime

LODR Reg 30

Read with Schedule III Part A. An equity filer in BSE Group B, so the Regulation 30 disclosure framework and the Schedule III event list both apply.

Sources Price, day change, 52-week range — bse.quote, bse.quoteWeeklyHL, 28 August 2026 close. Market cap and free float — bse.getScripTradingStats. P/E, P/B, EPS, ROE, margins — bse.equityMetaInfo. Quarterly and annual results — bse.resultsSnapshot, standalone, as filed. Four-tier classification — data/reference/companies.csv. Filing counts and tags — the build aggregate for this window. Notes Book value is derived as price ÷ P/B; BSE does not publish it directly. Share count is derived as market cap ÷ price. Figures move between captures and between vendors, and the two are not an error in either: companies.csv carries the market cap from an earlier sweep than the snapshot above. EPS appears twice with different meanings — the figure beside P/E is the trailing one from equityMetaInfo, while the EPS in the results table is the per-period figure as filed.

Filing rhythm · 126 trading days

11 filings · 3 selected · busiest 2026-11-04

Filing rhythm · the twelve most recent

2026-09-072026-11-05

SelectedProcedural

Filings

11 in the window · 18 earlier on record

  1. 5 November 2026 ·

    Newspaper Publication

    Newspaper Publication

    Please find enclosed copy of Newspaper Publication for Unaudited Financial Results for quarter and half year ended on September 30, 2026.

    Company Update / Newspaper Publication View filing →

  2. 4 November 2026 ·

    Auditor Resignation

    Resignation of Statutory Auditors

    Please find enclosed intimation of resignation of statutory auditor of the company w.e.f. close of business hours on November 04, 2026.

    Company Update / Resignation of Statutory Auditors View filing →

  3. 4 November 2026 ·

    Results

    Results - Financial Results For Quarter And Half Year Ended On September 30, 2026

    Please find enclosed Unaudited Financial Results for quarter and half year ended on September 30, 2026.

    Result / Financial Results View filing →

  4. 4 November 2026 ·

    Board Outcome

    Board Meeting Outcome for Outcome Of Board Meeting Held On November 04, 2026.

    Please find enclosed Outcome of Board Meeting for Unaudited Financial Results for quarter and half year ended on September 30, 2026 and other business matters.

    Board Meeting / Outcome of Board Meeting View filing →

  5. 28 October 2026 ·

    Board Meeting

    Board Meeting Intimation for Prior Intimation Of Board Meeting Schedule To Be Held On November 04, 2026.

    Sadbhav Engineering Ltd has informed BSE that the meeting of the Board of Directors of the Company is scheduled on 04/11/2026 ,inter alia, to consider and approve the Un-Audited Standalone ....

    Board Meeting / Board Meeting View filing →

  6. 30 September 2026 ·

    AGM / EGM

    Shareholder Meeting / Postal Ballot-Outcome of AGM

    Please find enclosed proceeding of 37th Annual General Meeting held on September 30, 2026.

    AGM/EGM / AGM View filing →

  7. 25 September 2026 ·

    Trading Window

    Closure of Trading Window

    Closure of Trading Window due to declaration of unaudited financial results for the quarter and half year ended on September 30, 2026

    Insider Trading / SAST / Closure of Trading Window View filing →

  8. 25 September 2026 ·

    AGM / EGM

    Addendum To Notice Of 37Th Annual General Meeting Schedule To Be Held On September 30, 2026

    Please find enclosed addendum to Notice of 37th Annual General Meeting schedule to be held on September 30, 2026.

    AGM/EGM / AGM View filing →

  9. 8 September 2026 ·

    Newspaper Publication

    Newspaper Publication

    Please find enclosed copy of newspaper publication for Notice of 37th Annual General Meeting, Remote E-voting Information and book closure of the Company.

    Company Update / Newspaper Publication View filing →

  10. 7 September 2026 ·

    Annual Report

    Reg. 34 (1) Annual Report.

    Please find enclosed Annual Report for FY 2025-26 of Sadbhav Engineering Limited

    Others / Reg. 34 (1) Annual Report View filing →

  11. 7 September 2026 ·

    AGM / EGM

    Notice Of 37Th Annual General Meeting Of The Company

    Notice of 37th Annual General Meeting of the Company schedule to be held on Wednesday, 30th September, 2026 at 3.00 pm through VC/OAVM.

    AGM/EGM / AGM View filing →

RSS feed for Sadbhav Engineering Ltd · the 50 most recent filings